Harbin Steam Turbine Factory Co., Ltd. (hereinafter Harbin Steam Turbine Co., Ltd.) recently broke news. The company has fully mastered the world's most advanced nuclear power turbine design key technologies. The preliminary design of its independently developed CAP1400 nuclear power turbine has been completed. At this point, Kazakhstan Automobile achieved a nuclear power turbine development from 650MW to 1250MW, and then to more power across.

It is understood that the company has achieved remarkable results in the first year of the “Twelfth Five-Year Plan”. This year, 51.82% of the year's plan for the steam turbine of the power plant was completed, and the total industrial output value of the company was 52.48% of the annual plan. The total profit completed is the annual plan. 50.66% of the total. Among these, the company has shown good advantages in the development of three-generation nuclear power turbines.

Yang Qiguo, chairman and general manager of Harbin Auto, who has surpassed self-promotion CAP1400, said that due to the impact of the nuclear accident in Fukushima, Japan, China has decided to suspend the approval of new nuclear power projects, but the demand for nuclear power development is objective and future development. More emphasis will be placed on its security. In order to develop nuclear power technology, as early as the "10th Five-Year Plan" period, Kazakhstan Automobile developed a technical reserve for the development of higher-level products while developing a 650MW nuclear power turbine. Successively carried out research on the key technologies of a million-level nuclear turbine, completed design schemes for full-speed and half-speed steam turbines, and plans for full-speed and half-speed steam turbine machining and quality assurance; and jointly researched and developed CAP1400 rotors for complete forging with China First Weapon and Japan JSW. Self-developed 1200 mm, 1800 mm long blades; Completed supplementary research topics in PWR turbine design, technology, materials, etc., and completed the program design of 1000MW full-speed nuclear turbine. At the same time, a complete nuclear power quality assurance system has been formed, laying a solid foundation for the design and manufacture of nuclear power turbines of the million kilowatts level.

The CAP1400 nuclear power station was included in the “12th Five-Year Plan” key scientific research project by Kazakhstan Auto. Since the beginning of this year, the company has carried out reinvention on the basis of digesting and absorbing China’s introduction of third-generation nuclear power technology. The relevant experts fully affirmed the project design plan of Kazakhstan Auto.

Independent innovation to build China's nuclear power brand As early as 1992, Harbin Electric fully utilized and absorbed the related technology of American Westinghouse Electric Company and successfully developed the HN64.2-6.41 (650MW) nuclear power turbine. In December 1999, China’s first nuclear power unit was upgraded from 300 MW to 650 MW. The Qinshan nuclear power plant of the second phase of the second phase of the company’s 650 MW nuclear power turbine, which was responsible for the transition from the test and evaluation power station to the commercial power station, was completed. The first unit was completed in April 2002. On the 17th, the company passed the 168-hour test run and was officially put into commercial operation; on the 1st of June 2003, the non-nuclear steam reformed successfully on the 2nd unit, setting a record for the localization rate of high-power nuclear power turbines at that time. The two units successively passed the review and appraisal commissioned by the China National Machinery Industry Federation commissioned by the National Development and Reform Commission and won the National Major Technical Equipment Achievement Award and the National Key New Product Award.

Thanks to the excellent performance of the two 650MW nuclear power turbines of Qinshan Nuclear Power Phase II, Kazakhstan Auto once again won the manufacturing contract of two 650MW nuclear power turbines for the conventional island of Qinshan Phase II expansion project. It was manufactured in 2008 and officially put into operation on August 1, 2010. Commercial operation.

So far, Harbin Auto has provided four 650MW nuclear power nuclear turbines for Qinshan Nuclear Power Phase II and Phase II expansion projects. Among the 11 major assessment indicators, 9 have reached the world advanced level. Especially in the manufacture of the two units in the second phase of the expansion project, the design route of “based on independent innovation and building an independent brand” has emerged, and the main equipment has fully realized localization.

In 2010, Kazakhstan Auto assumed the task of providing two improved 650MW nuclear power turbines for the Changjiang Power Station in Hainan Province. The main parameters required for the two units provided by this time are basically the same as those of the No. 1 and No. 2 units of Qinshan Nuclear Power Phase II. However, the performance of the unit has been further optimized. The safety level and economic level of the unit have been further improved compared with the second phase of Qinshan Nuclear Power.

New breakthroughs have been made to overcome the difficulties of the third-generation nuclear power technology. According to the “National Nuclear Power Development Thematic Planning (2005~2020)”, the construction of the third-generation PWR first-stage project with Chinese brand started in 2010 and the third batch of construction after 2015. Replacing nuclear power plants on behalf of water reactors will become the overall deployment of China’s nuclear power generation models after 2020, and will set technical development targets on three generations of nuclear power technologies.

AP1000 is the result of the research that Westinghouse Company has always insisted on. At the end of 2006, China and the United States signed a memorandum of cooperation on cooperation and technology transfer for AP1000. In accordance with the instructions of the relevant national ministries and commissions, from the beginning of 2005, Harbin Electric Group Co., Ltd., Harbin Electric Co., Ltd. (former Harbin Power Equipment Co., Ltd.) and Kazakhstan steam leaders cooperated with the third-generation nuclear power CI (conventional island) The matter was extensively contacted and negotiated. It was finally determined that a joint venture with Mitsubishi Corporation, which controls the third-generation nuclear power technology of American Westinghouse’s AP1000, will participate in the bidding for the Sanmen and Haiyang nuclear power plants.

On September 28, 2007, at the signing ceremony of the equipment supply and design contract for the conventional island equipment for the first phase of the nuclear power plant of China Nuclear Power Group's Sanmen nuclear power plant held in the Great Hall of the People in Beijing, Harbin Electric Power Corporation and Mitsubishi Corporation of Japan and Sanmen Nuclear Power Co., Ltd. Signed a three-phase supply contract for conventional nuclear power equipment for nuclear power, marking that it has become the first steam turbine manufacturing enterprise in the country and even the world to enter the third generation of nuclear power, further defending its leading position in the field of domestic nuclear power turbines.

In 2010, Kazakhstan Automobile strategically proposed innovative development models of "big production" and "off-site manufacturing." After a large amount of preparatory work, the company set up a nuclear power office, built a nuclear power equipment branch, and invested in Qinhuangdao and Dalian to build a general assembly base, which has now been fully put into production.

The three generations of nuclear power generating units of the third generation are the first organization of production of the steam turbines. It is very difficult and represents the most advanced manufacturing level of nuclear power in the world. Through the close cooperation and careful organization of the company's various departments, most modules of the world's first three-generation nuclear power condensers have been completed and shipped smoothly on the Qinhuangdao assembly line. In addition, the low pressure heater first tube sheet is processed, and high pressure cylinders, low pressure cylinders and other key components have fully entered the production and processing stage. All of these signals that the company has stepped into a new stage of standardization, specialization, and mass production in the manufacturing of millions of nuclear power conventional island equipment, and has continuously achieved new breakthroughs.

After market promotion and bidding, Harbin Auto has now won 12 supply contracts including Sanmen, Haiyang, Xianning and Tianwan.

Focusing on the future, we will make every effort to build a quality project affected by the leakage of the nuclear power plant in Fukushima, Japan. The development of short-term nuclear power will be slowed down to some extent. However, Kazakhstan Auto has full confidence in the future development of nuclear power: In the long term, due to the impact of resources and environmental pressure, China's policy of developing nuclear power will not change, and the development mode will be transformed from vigorous development to safe and efficient development. With the increasing emphasis on the safety of nuclear power, the future market prospects of the third-generation nuclear power AP1000 featuring “non-active safety” will be further improved.

During this period, Kazakhstan Automobile quickly improved the nuclear power production and manufacturing system, formulated a complete "Nuclear Power Quality Assurance Program", and compiled nine special procedures for document control, non-conformance control, auxiliary material control, material procurement, and outsourcing control. Controlling the design, procurement, and production processes, and further accelerating the digestion and absorption of imported technologies, investing more energy in quality assurance, and doing its utmost to ensure that Sanmen, Haiyang, and other third-generation nuclear power projects are under construction and build quality products. engineering. In strict accordance with the requirements of nuclear power quality assurance system to organize production, increase the monitoring of the entire process to ensure the quality and safety of the production process and key components.

At the same time, Harbin Automobile vigorously promoted the construction of “nuclear culture” throughout the company and even the related supplier companies, integrating the “four common things” and “four emphasis” of nuclear power into the entire production process.

Remote Controlled Sockets

REMOTE CONTROL SOCKET
Important Safeguards
When using any electrical appliance, in order to reduce the risk of fire, electric shock and/or injury to persons, basic safety precautions should always be follow8d. including:
• The appliance is for household and indoor use only.
• Before plugging in. check that the voitage on the rating label is the same as the mains supply.
• To protect against electric shock, do not immerse any part of the product in water or other liquid.
• This socket is intended for use by competent adults only and children should be supervised at all times.
• Do not use the socket for other than its intended use.
• This socket can be used by children aged from 8 years arxl above and persons with reduced physical, sensory or mental capabilities or lack of experience and knowledge if they have been given supervision or instruction concerning use of the appliance in a safe way and understand the hazards involved. Children shall not p<ay with the appliance Cleaning and user maintenance shall M be made by children without supervision.
• Children of less than 3 years should be kept away unless continuously supervised.
Children from 3 years and less than 8 years shall only switch on/off the appliance provided that it has been placed or installed in its intended normal operating position and they have been supervision or instruction concerning use of the appliance in a safe way and understand the hazards involved. Children aged from 3 years and less than 8 years shall not plug in. regulate and clean the appliance or perform user maintenance.
• Don't use this socket in the immediate surroundings of a bath, a shower or a swimming pool.
• In case of malfunction, do not try to repair the socket yourself, it may result in a fire hazard or electric shock
Do Not Exceed Maximum a680W
Place the LR44 batteries provided into the compartment in the back of the Remote Control, please
insert as sho*/m in the back of the compartment to ensure the polarity is correct.

Programming Instructions
• Plug the Remoce Socket$($)lnto the wall socket(s) and switch on the mams supply, the red LED will flash every second.
• If the LED is not flashing press & hold the manual ON/OFF button for 5 seconds until it Hashes

•Press any ON switch on the Remote Control for approximately 2 seconds and the Remote Socket(s) learn the code. The LED will stop flashing top confirm the codehas been accepted.
• Any number of Remote Sockets can be programmed to one Remote Control ON button to create multiple switching.
• To programme o<her Remote Sockets on different Remote Control ON buttons repeat the prevous steps
• If the mains supply is turned off the Remote Sockets v/ill lose their code and it wil be necessary to re-pcogramme.
Operation:
• Plug your appliance(s) into the Remote Socket(s)
• Press the programmed ON or OFF button on the Remote Control to control the Remote Socket.
♦ The Remote Sockets can also be operated manually using its ON/OFF Button Trouble shooting
If a Remote Socket does not react to the Remote Control please check the followng:
♦ Low battery in tbo Remote Control
• Distance too large between the remote control and the recerver (ensure the range distance is no more than 20 clear Metres) and free from obstacle that may reduce the distance.
• If programming has not been successful, tum the power off and back on then follow the programming steps above.
How to decode
• Press the manual ONX)FF button for 5 seconds until the red LED flashes once per
second to confirm de-coding is successful
♦ Press the ALL OFF switch on the Remote Control for more than 3 seconds, the LED
flashes once per second to confirm (decoding successful.
Voltage: 240V-/50HZ
Max power rating: 3680W max.
Remote frequency:
Remote range:
Battery Type:
433.92MHz
230 Metres
Button Cell 2x1.5V LR44 =
Please check with your local waste management service authority regarding regulations for the safe disposal of the batteries. The batteries should never be placed G municipal waste.
Use a battery d^posal facility if available
M
For eioctncal products sold within the European Community. At the end of the electrical products useful life, it should not be disposed of wth household waste. Please recycle faaMies exist. Check with your Local Authonty or retailer for recycling advice.
C€

Remote Control Plug Socket,Remote Controlled Mains Outlet,Remote Control Plug Adapters,Remote Control Sockets,Remote & Smart Controlled Sockets,Electric Sockets Plus Remote Control

NINGBO COWELL ELECTRONICS & TECHNOLOGY CO., LTD , https://www.cowellsockets.com

Posted on