Heating cable heating is called the most ideal heating method in winter, not only because of its economy, safety, convenience, high quality, but because it regards people as the main body of life, highlighting the three modernities of comfort, health and environmental protection. The theme of life; high humanized design, simple and flexible control method, which brings great convenience to the user; the system structure hidden under the ground minimizes the indoor space. The heating cable heating system mainly relies on far-infrared radiation heat transfer (accounting for more than 60% of the total heat transfer), and its radiation principle is the same as the solar radiation principle. The way of heat transfer is divided into three forms: convection, conduction and radiation. Radiant heat is the most comfortable heat transfer method for the human body. It gives people a feeling of warm sunshine. There is no air flow and no heat, people can according to their own needs. Set the indoor temperature that suits you best. It is not affected by the outdoor temperature. It is not restricted by the season. The interior is always warm and spring-like. Pay attention to 10 points when installing the heating cable: 1. The material specifications and types of various materials must meet the requirements of design and corresponding specifications, and the corresponding documents must be complete; 2. Prevent the heating cable from being pressed into the heat insulating material and affect the life of the heating cable. The steel wire mesh or the metal fixing tape can prevent the heating cable from being pressed into the heat insulating material; 3. The inner tube wear limit is confirmed after confirming that the heating cable or the electric heating film is laid correctly. Before the threading, the inside of the cassette must be cleaned, so that the color separation of the wire is correct and the remaining amount is appropriate; 4, the temperature controller installation should be horizontal and vertical, the standard is accurate, close to the wall, fixed and reliable, in line with the electrical sub-project acceptance criteria; 5. All construction workers must wear soft-soled shoes and clean the entire working surface after the pipe is sealed; 6. The installation of the floor radiant heating system should not be carried out at the same time as other construction operations; 7. During the pouring and curing process of the concrete filling layer, it is not allowed to enter the trampling. When pouring the concrete, it is necessary to take protective measures. It is not allowed to directly pedal, drive the heating cable or the electric heating film heating zone; after the filling layer is cured, it shall not be Heavy load or high temperature objects on the ground; 8. The electric floor heating floor completed by the construction is strictly forbidden to be beaten and impacted. Do not open, dig or join the Rehe objects on the ground; 9. Equipotential connection in the whole room to ensure personal safety; 10, thermostat probe and paving and connecting the heating cable protection. Smart Watches,Smart Bracelet,Blood Pressure Smart Watch,Health Monitor Smart Watches; C&Q Technology (Guangzhou) Co.,Ltd. , https://www.gzcqteq.com
The heating cable is made into a cable structure, and the power is used as an energy source. The alloy resistance wire is used for electric heating to achieve heating or heat preservation. There are usually single and double conductors, called heating cables.